Shake down cruise.  All went well.

Shake down cruise. All went well.

  • Reaction score 0
  • Comments 0
If I weren't driving I could go for a great  ale right now.

If I weren't driving I could go for a great ale right now.

  • Reaction score 0
  • Comments 0
Ready to head north.

Ready to head north.

  • Reaction score 0
  • Comments 0
Putting her on the trailer (Wed 5-4

Putting her on the trailer (Wed 5-4

  • Reaction score 0
  • Comments 0
Final clean-up

Final clean-up

  • Reaction score 0
  • Comments 0
Engine going on. (Tue 5-3)

Engine going on. (Tue 5-3)

  • Reaction score 0
  • Comments 0
Bennett hydraulic pump under starboard aft 
floor.

Bennett hydraulic pump under starboard aft floor.

  • Reaction score 0
  • Comments 0
Throttle and dash.

Throttle and dash.

  • Reaction score 0
  • Comments 0
Slide out counter that I built and had C-Dory install.

Slide out counter that I built and had C-Dory install.

  • Reaction score 0
  • Comments 0
Guages in (Mon 5/2)

Guages in (Mon 5/2)

  • Reaction score 0
  • Comments 0
Trim tabs installed (Fri 4/29)

Trim tabs installed (Fri 4/29)

  • Reaction score 0
  • Comments 0
Cabin door installed (Fri 4/29)

Cabin door installed (Fri 4/29)

  • Reaction score 0
  • Comments 0
Helm and cabin complete (Fri 4/29)

Helm and cabin complete (Fri 4/29)

  • Reaction score 0
  • Comments 0
Gas tank plumbing (Mon 4-25)

Gas tank plumbing (Mon 4-25)

  • Reaction score 0
  • Comments 0
18X12 Bennett Trim Tabs going on (Tue 4-26)

18X12 Bennett Trim Tabs going on (Tue 4-26)

  • Reaction score 0
  • Comments 0
Bulkhead and switch panel (Tue 4-26)

Bulkhead and switch panel (Tue 4-26)

  • Reaction score 0
  • Comments 0
Pulpit, bow roller, winch. (Tue 4-26)

Pulpit, bow roller, winch. (Tue 4-26)

  • Reaction score 0
  • Comments 0
Bow gear is on. (Tue 4-26)

Bow gear is on. (Tue 4-26)

  • Reaction score 0
  • Comments 0
Cockpit rails installed Thurs (4-21)

Cockpit rails installed Thurs (4-21)

  • Reaction score 0
  • Comments 0
Thurs (4-21)

Thurs (4-21)

  • Reaction score 0
  • Comments 0
Grab rails and some cleats installed.(Mon 4/18)

Grab rails and some cleats installed.(Mon 4/18)

  • Reaction score 0
  • Comments 0
Port side cabinets installed (Mon 4/18)

Port side cabinets installed (Mon 4/18)

  • Reaction score 0
  • Comments 0
Cabinets with kick plate cutout.

Cabinets with kick plate cutout.

  • Reaction score 0
  • Comments 0
Cabinets/deepsink are in. (Mon 4/18)

Cabinets/deepsink are in. (Mon 4/18)

  • Reaction score 0
  • Comments 0
A

New Hull w/ balsa (Mon 3/14)

  • Items 42
  • Album owner Alyssa Jean
  • Date created
No description
There are no comments to display.

Album information

Category
Construction of the new Anna Leigh
Album owner
Alyssa Jean
Date created
Item count
42
View count
5,756
Comment count
0
Rating
0.00 star(s) 0 ratings

Album privacy

Alyssa Jean

Can view media items
Inherited from category
Can add media items
Album owner only

Share this album

Back
Top