M

On my way to Anacortes to finish the Wallas installation project. All that is left is connection to 12v power, and installation of the remote switch. Assuming all works, the plan is to test it out in the evening in low 30's temps.

  • Media owner MikeR
  • Date added
On my way to Anacortes to finish the Wallas installation project. All that is left is connection to 12v power, and installation of the remote switch. Assuming all works, the plan is to test it out in the evening in low 30's temps.
There are no comments to display.

Share this media

Back
Top