The tube bonded in on the splashwell side. I inserted it from astern just to where I wanted it, and let it "run wild" on the outside, to be cut off later. This made it easier to work with than a just-right-sized tube.
The tube bonded in on the splashwell side. I inserted it from astern just to where I wanted it, and let it "run wild" on the outside, to be cut off later. This made it easier to work with than a just-right-sized tube.