Search results

  1. Using a good paint helps too.  Interlux Micron 66 works well.

    Using a good paint helps too. Interlux Micron 66 works well.

    Using a good paint helps too. Interlux Micron 66 works well.
  2. Trailer bunks with sling cut outs.

    Trailer bunks with sling cut outs.

    Trailer bunks with sling cut outs.
  3. New Bottom paint 10-5-13. We raised the waterline about 2" because of the scum line we developed when in the water for while.

    New Bottom paint 10-5-13. We raised the waterline about 2" because of the scum line we developed when in the water for while.

    New Bottom paint 10-5-13. We raised the waterline about 2" because of the scum line we developed when in the water for while.
  4. Lifting off the trailer one side at a time for paint.

    Lifting off the trailer one side at a time for paint.

    Lifting off the trailer one side at a time for paint.
  5. Trim tabs were treated with epoxy prior to painting

    Trim tabs were treated with epoxy prior to painting

    Trim tabs were treated with epoxy prior to painting
  6. 2014 Aluminum Trailer (Load Rite Elite, 8400# Cap. 102" torsion axles W/ elec/hydraulic disc brakes & Vortex 100,000 mile hubs)

    2014 Aluminum Trailer (Load Rite Elite, 8400# Cap. 102" torsion axles W/ elec/hydraulic disc brakes & Vortex 100,000 mile hubs)

    2014 Aluminum Trailer (Load Rite Elite, 8400# Cap. 102" torsion axles W/ elec/hydraulic disc brakes & Vortex 100,000 mile hubs)
  7. Stainless Davit & Arch

    Stainless Davit & Arch

    Stainless Davit & Arch
  8. Helm & overhead storage door, holly & teak to compliment teak & holly floors.

    Helm & overhead storage door, holly & teak to compliment teak & holly floors.

    Helm & overhead storage door, holly & teak to compliment teak & holly floors.
  9. Canvas cockpit encloser

    Canvas cockpit encloser

    Canvas cockpit encloser
  10. port side aft

    port side aft

    port side aft
  11. Storage below bunk w/ cabinet built to match the rest of the boat.

    Storage below bunk w/ cabinet built to match the rest of the boat.

    Storage below bunk w/ cabinet built to match the rest of the boat.
  12. V-berth with custom memory foam matress & bedding, hypervent under matress, walls insulated with closed cell foam & lined with tan carpet/headliner.

    V-berth with custom memory foam matress & bedding, hypervent under matress, walls insulated with closed cell foam & lined with tan carpet/headliner.

    V-berth with custom memory foam matress & bedding, hypervent under matress, walls insulated with closed cell foam & lined with tan carpet/headliner.
  13. Storage added in v-berth.

    Storage added in v-berth.

    Storage added in v-berth.
  14. New Dometic 2.3 Cubic Ft. Refer with separate freezer area, wired 110 or 12 volt.

    New Dometic 2.3 Cubic Ft. Refer with separate freezer area, wired 110 or 12 volt.

    New Dometic 2.3 Cubic Ft. Refer with separate freezer area, wired 110 or 12 volt.
  15. Interior updates

    Interior updates

    Interior updates
  16. Port side w/ new table to compliment flooring, woodwork & new upholstery.

    Port side w/ new table to compliment flooring, woodwork & new upholstery.

    Port side w/ new table to compliment flooring, woodwork & new upholstery.
  17. Starboard side & new Formica counter tops.

    Starboard side & new Formica counter tops.

    Starboard side & new Formica counter tops.
  18. Starboard side, the helm seat easily  removes for extra galley counter space.

    Starboard side, the helm seat easily removes for extra galley counter space.

    Starboard side, the helm seat easily removes for extra galley counter space.
  19. Galley cupboards

    Galley cupboards

    Galley cupboards
  20. Anchored in the Tombolo, Lopez Pass

    Anchored in the Tombolo, Lopez Pass

    Anchored in the Tombolo, Lopez Pass
Back
Top