Jake B
New member
- Joined
- Jun 6, 2012
- Messages
- 521
- Reaction score
- 0
- C Dory Year
- 1989
- C Dory Model
- 22 Cruiser
- Vessel Name
- PLUS 3
So I have still yet to put in an anchor locker drain, as we were not really using it and I was not really wanting to put holes in the boat. but now the time has come(here in a week or so ) and after reading through the old post about a potential void and drain tubes ect. I was just curious is it better to drill the hole 1/2-3/4" too high and raise the floor or drill it in the bottom corner and check for potential gap that could drain into v-birth?
I looked closely at sunbeam pictures of what was done there, as well as read that the void could of been caused by a non bonded tab being drilled at the factory? and if that is what happened then There should be no concern for mis-draining?
and what size clam shell should I order and it looks to be 1/2" hole is desired?
my plan was to drill hole and then coat with epoxy.....
I ended up with 300' total rode 275' 8 plait and 25' chain....
I looked closely at sunbeam pictures of what was done there, as well as read that the void could of been caused by a non bonded tab being drilled at the factory? and if that is what happened then There should be no concern for mis-draining?
and what size clam shell should I order and it looks to be 1/2" hole is desired?
my plan was to drill hole and then coat with epoxy.....
I ended up with 300' total rode 275' 8 plait and 25' chain....