Went to install our Garlick Gullwing swim step on the CD22 today. Expecting to drill out the hole 5/8 then fill with epoxy and then wait days (seeing that it has not been that warm lately) for the epoxy to dry and then install the steps.
Well, I was very pleased as I drilled thru the transom (right where the transom hook is) - and NO wood shavings came off the drill. That area is solid fiberglass - great news.
Now, tomorrow I'll get the backing plate, the bolts, and a bit of 4200 and I'll be all set.
Gotta like that.
Well, I was very pleased as I drilled thru the transom (right where the transom hook is) - and NO wood shavings came off the drill. That area is solid fiberglass - great news.
Now, tomorrow I'll get the backing plate, the bolts, and a bit of 4200 and I'll be all set.
Gotta like that.